首页> 外文期刊>Argus Coal Daily International >Philippine coal unit off line after malfunctioning
【24h】

Philippine coal unit off line after malfunctioning

机译:菲律宾煤机出故障后下线

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A coal-fired power unit on Mindanao island in the Philippinesis temporarily off line following a malfunction last week.A 150MW unit at the 300MW Toril coal-fired power plantwas taken off line following a boiler tube leak on 7 April. Butthe unit is expected to begin producing power again afterrepairs are completed on 21 April.The plant, which is operated by Philippine utilityAboitiz Power subsidiary Therma South, began commercialoperations of its second 150MW unit at the 300MW Torilplant in Davao City on 3 February — achieving its February2016 targeted operational deadline.
机译:上周发生故障后,菲律宾棉兰老岛上的一座燃煤发电机组暂时下线.4月7日,由于锅炉管泄漏,300兆瓦托里尔燃煤电厂的150兆瓦机组被关闭。但是,该机组有望在4月21日维修完成后再次开始发电。该电站由菲律宾公用事业公司Aboitiz Power子公司Therma South经营,于2月3日在达沃市300MW Torilplant上开始了其第二台150MW机组的商业运行, 2016年2月的目标运营截止日期。

著录项

  • 来源
    《Argus Coal Daily International》 |2016年第72期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号