...
首页> 外文期刊>Contractor >Station mastered
【24h】

Station mastered

机译:站掌握

获取原文
获取原文并翻译 | 示例
           

摘要

NEARLY 100 years of continuous use had taken its toll on Melbourne's Flinders Street Station, so the Victorian Government allocated 13 million dollars to strengthen the deck of the station concourse. To help the old concourse cope with increased loads, Sydney-based contractor Eptec applied BASF Construction Chemicals' MBrace unidirectional carbon fibre sheets to the underside of the concourse structure. The project offered some additional challenges when compared to most projects, including work scheduling amidst an operating railway station, and more than 100 years of built-up dirt and grime on the concrete surface.
机译:墨尔本弗林德斯街车站(Flinders Street Station)连续使用将近100年,因此维多利亚州政府拨款1300万加元来加固车站大厅的甲板。为了帮助老旧的大厅应对增加的负荷,总部位于悉尼的承包商Eptec将BASF Construction Chemicals的MBrace单向碳纤维板应用于大厅结构的下侧。与大多数项目相比,该项目提出了一些其他挑战,包括在运行中的火车站中进行工作计划以及在混凝土表面堆积100多年的灰尘。

著录项

  • 来源
    《Contractor》 |2007年第12期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号