...
首页> 外文期刊>Chemical Weekly >Reliance Industries to restart fire-hit oil processing unit
【24h】

Reliance Industries to restart fire-hit oil processing unit

机译:信实工业重启受灾石油加工装置

获取原文
获取原文并翻译 | 示例

摘要

Reliance Industries Ltd has said it is likely to repair and restart the fire-damaged secondary oil processing unit at its Jamnagar refinery by this November end."We have started rebuilding the damaged unit.The damage is not of such a .large magnitude as was projected.It will take 2-3 weeks to restart the unit," RIL CEO (Oil and Gas),Mr.P M S Prasad said.The unit,which removes sulphur from oil products,was shut on October 25 after a fire broke out.Mr.Prasad said that there was no production loss due to the fire and the refinery was producing LPG at its normal capacity of 7,200 tonnes per day.The fire had no impact on major equipment,he added.
机译:Reliance Industries Ltd表示,有可能在今年11月底之前在其Jamnagar炼油厂修复并重启起火的二次油处理装置。“我们已经开始重建受损的装置。损坏程度不会像以前那样大。 RIL首席执行官(石油和天然气)PMS Prasad先生说。该装置是从石油产品中脱硫的装置,在大火发生后于10月25日关闭。普拉萨德先生说,大火没有造成任何生产损失,炼油厂的日产量为正常的7200吨液化石油气。大火对主要设备没有影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号