...
首页> 外文期刊>Chemical Week >Fire on vessel carrying equipment likely to delay Petronas's project
【24h】

Fire on vessel carrying equipment likely to delay Petronas's project

机译:船上设备起火可能会延迟马来西亚国家石油公司的项目

获取原文
获取原文并翻译 | 示例
           

摘要

Petronas (Kuala Lumpur) says a contractor has notified the company of a fire incident aboard a vessel carrying equipment items to Petronas Chemicals' subsidiary Petronas Chemicals Fertilizer Sabah. The equipment was headed for the $i.5-billion Sabah Ammonia and Urea (Samur) project, one of Petronas Chemicals' main growth projects. The incident disrupted rhe delivery of critical equipment to the project, leading to potential delays, the company says. Samur is being built at the Sipitang oil and gas industrial park in Sabah State, Malaysia.
机译:马来西亚国家石油公司(吉隆坡)说,承包商在向Petronas Chemicals的子公司Petronas Chemicals Fertilizer Sabah运送设备的船只上发生了一起火灾事故。该设备用于耗资15亿美元的沙巴氨和尿素(Samur)项目,该项目是马来西亚国家石油公司的主要增长项目之一。该公司称,此事件扰乱了向该项目的关键设备的交付,从而导致了潜在的延误。 Samur正在马来西亚沙巴州的Sipitang油气工业园区内建造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号