首页> 外文期刊>Автоматическая Сварка >Application of leak-before-break concept for provision of the safety of pipings of WWER-1000 type reactors
【24h】

Application of leak-before-break concept for provision of the safety of pipings of WWER-1000 type reactors

机译:先破漏漏概念的应用为WWER-1000型反应堆的管道安全提供了保证

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A program of R&D on substantiation of applicability of leak-before-break concept to nuclear reactor piping has been outlined and fulfilled. J-R curves measured on full-scale samples cut out of a welded pipe with the working cross-section of 70×250 mm with through-thickness and semi-elliptical cracks in the circumferential weld metal were compared with similar curves derived on compact samples of ST-1T. It is found that the parameters of plastic fracture toughness measured on ST-1T samples are characterised by a higher level of reliability compared to those of full-scale samples.
机译:概述并实施了一项关于确定先破漏漏概念在核反应堆管道中的适用性的研发计划。将在工作横截面为70×250 mm的焊管上切出的全尺寸样品上测得的JR曲线与圆周焊缝金属中的贯穿厚度和半椭圆形裂纹进行了比较,并将其与从ST紧凑型样品得到的相似曲线进行了比较-1T。发现与全尺寸样品相比,在ST-1T样品上测量的塑性断裂韧性参数具有更高的可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号