首页> 外文期刊>電気加工学会誌 >Prevention of wire breakage during wire EDM-2nd report: grouping method of gap signals according to discharged location
【24h】

Prevention of wire breakage during wire EDM-2nd report: grouping method of gap signals according to discharged location

机译:防止在电火花线切割过程中发生断线第二报告:根据放电位置对间隙信号进行分组的方法

获取原文
获取原文并翻译 | 示例
           

摘要

In the 1st report{sup}1) we investigated about 3 gap monitoring signals: discharge voltage, ignitiondelay time and a radio signal just before wire breakage, in order to know which of them is the bestsignal to pre-monitor the wire breakage during wire EDM. Results showed that the discharge voltageis the best signal by which to pre-monitor the wire breakage. But other signals were not so clear.In the present report, we propose a new detecting method dividing these signals into groups accordingto discharged locations. This method clarify an abnormal gap state just before the wire breakage.Finally, we discuss a model of wire breakage that is able to explain obtained experimental results.
机译:在第一份报告{sup} 1)中,我们研究了大约3个间隙监控信号:放电电压,点火延迟时间和断线前的无线电信号,以便了解其中哪一个是预监控断线期间断线的最佳信号EDM。结果表明,放电电压是预监控断线的最佳信号。但是其他信号还不清楚。在本报告中,我们提出了一种新的检测方法,根据放电位置将这些信号分为几组。最后,我们讨论了一种断线模型,该模型能够解释获得的实验结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号