...
首页> 外文期刊>Concrete Products >TOTAL PRECAST SOLUTION/CLARK PACIFIC STEERS CALTRANS DISTRICT HEADQUARTERS SPECS
【24h】

TOTAL PRECAST SOLUTION/CLARK PACIFIC STEERS CALTRANS DISTRICT HEADQUARTERS SPECS

机译:总预铸溶液/克拉克转向架CALTRANS分布总部面积

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

64 million Australia dollars, 211,000-sq.-ft. project recently completed by West Sacramento-based Clark Pacific is the first State of California office building to feature "all-in-one" total precast construction. The Caltrans District 3 Office Building in Marysville features architecturally finished precast column, beam and floor plank elements-produced from locally extracted materials-joined in a hybrid moment frame system. A design-build team led by architect AC Martin and general contractor Turner Construction selected total precast for the new Caltrans facility to achieve cost-effective, rapid erection with superior seismic performance and a high-end architectural appearance, while promoting environmental stewardship. The building's precast components were fabricated over 14 weeks, and erection of the above-grade structure was accomplished in 19 weeks. Application is underway for a LEED [Leadership in Energy and Environmental Design] Silver rating for the project.
机译:6,400万澳元,211,000平方英尺总部位于西萨克拉曼多的克拉克太平洋(Clark Pacific)最近完成的该项目是加利福尼亚州第一座具有“多合一”总预制结构的办公楼。马里斯维尔(Marysville)的Caltrans第3区办公楼采用预制的预制柱,梁和楼板元素,这些元素是用当地提取的材料制成的,并加入了混合弯矩框架系统。由建筑师AC Martin和总承包商Turner Construction领导的设计建造团队为新的Caltrans工厂选择了总预制件,以实现具有成本效益的快速架设,并具有出色的抗震性能和高端的建筑外观,同时促进环境管理。该建筑的预制组件在14周内完成了装配,而上述结构的安装则在19周内完成。正在申请该项目的LEED(能源与环境设计领导力)银级。

著录项

  • 来源
    《Concrete Products》 |2008年第12期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水泥工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号