首页> 外文期刊>セメント·コンクリ-ト論文集 >STUDY ON THE BLOCKGE IN CONCRETE PUMPING WITH PRECEDING MORTARS
【24h】

STUDY ON THE BLOCKGE IN CONCRETE PUMPING WITH PRECEDING MORTARS

机译:先有砂浆的混凝土泵送堵塞研究。

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Before concrete pumping, a special mortar premixedwith cement, fine aggregate and chemical admixture wasapplied as a preceding mortar. Excessively long-termpumping, however, caused blockage for which possiblemechanisms were investigated. As a result, followings were found.(1)The pumped concrete preceded the preceding mortar andseparated into cement paste and aggregates which formed amajor part of the blockage.(2)Coarse aggregate content in the blockage was 3 to 6percentlarger than the designed mixture proportion.(3)When the special preceding mortar was used, degradation ofpumped concrete quality was not found even near the blockage.
机译:在泵送混凝土之前,将预先与水泥,细骨料和化学外加剂混合的特殊砂浆用作之前的砂浆。然而,过度长期泵送导致堵塞,对此进行了研究。结果发现:(1)泵送的混凝土先于前砂浆,然后分离成水泥浆和集料,形成了堵塞的主要部分。(2)堵塞中的粗集料含量比设计的混合比例大3%至6% 。(3)当使用特殊的先前砂浆时,即使在堵塞附近也未发现泵送混凝土的质量下降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号