首页> 外文期刊>エバラ時報 >The 'Gaikaku Housuiro' drainage pump station second report: structural design of RC pump casings
【24h】

The 'Gaikaku Housuiro' drainage pump station second report: structural design of RC pump casings

机译:“ Gaikaku Housuiro”排水泵站第二次报告:RC泵壳的结构设计

获取原文
获取原文并翻译 | 示例
           

摘要

The structural design of pump casings for the Gaikaku Housuiro Pump Station, the largest of its kind in Japan, was complex as it involved large capacity and high head features. Accordingly, a highly reliable design method, which considers complex 3D structure and load distribution, was required. Consequently, a new program for computing the structual design of RC pump casing was developed. This program computes the required area of each pump casing member, as well as for studying concrete stress. This program is based on the limit state design method and uses configurational and element force data from FEM analysis. This program was put to use effectively for the design of pump casings used in the Gaikaku Housuiro Drainage Pump Station. The result was an optimal reinforcement design which enabled a high degree of reliability and safety.
机译:日本最大的Gaikaku Housuiro泵站的泵壳结构设计复杂,因为它具有大容量和高扬程的特点。因此,需要一种考虑了复杂的3D结构和载荷分布的高度可靠的设计方法。因此,开发了一个用于计算RC泵壳结构设计的新程序。该程序计算每个泵壳部件的所需面积,以及研究混凝土应力。该程序基于极限状态设计方法,并使用来自FEM分析的构造力和单元力数据。该程序被有效地用于Gaikaku Housuiro排水泵站的泵壳设计。结果是优化了钢筋设计,实现了高度的可靠性和安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号