首页> 外文期刊>33 Metal Producing >Olympic's New Temper Line Caps Months of Expansion
【24h】

Olympic's New Temper Line Caps Months of Expansion

机译:奥林匹克运动场的新火线限制了其扩张月

获取原文
获取原文并翻译 | 示例
           

摘要

Cleveland-based Olympic Steel has cut the ribbon on its new temper mill/cut-to-length complex there, one which CEO Michael Siegal sees capping a year of expansion and progress that included an initial public stock offering and an investment in tailored welded blank producer Lafayette Steel. The new Herr-Voss leveling line, with a four-high temper mill segment provided by Intergrated Industrial Systems (I2S), adds 120,000 tpy of process capability for Olympic in the expanding market of service centers raising the profile of their value-adding capability.
机译:总部位于克利夫兰的奥林匹克钢铁公司已经削减了其新的钢厂/定尺切割厂的生产线,该公司首席执行官迈克尔·西格尔(Michael Siegal)认为这将限制一年的扩展和进步,其中包括首次公开发行股票以及对量身定制的焊接坯料进行投资生产商拉斐特钢铁公司。新型的Herr-Voss矫直生产线由Intergrated Industrial Systems(I2S)提供的四辊高温轧机部门,在不断扩大的服务中心市场中为Olympic增加了12万吨的工艺能力,从而提高了其增值能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号