...
首页> 外文期刊>Computers in Industry >Towards a client-oriented integration of construction processes and building GIS systems
【24h】

Towards a client-oriented integration of construction processes and building GIS systems

机译:致力于以客户为导向的建筑过程和建筑GIS系统集成

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

BIM (Building Information Modelling) methodology allows sharing the information about the same construction between the involved stakeholders. The same building will be affected by different AEC (Architectural, Engineering and Construction) processes. Some n-dimensional extensions have been recently proposed in the literature. The fourth dimension of BIM represents the planning of the building phases. This dimension can be used to simulate the building state at a fixed point in time, as a snapshot. This paper shows the development of a Web3D visualizer, which integrates 3D documentation with building planning following the BIM methodology using just Open Source software. Our main contribution is the merging of project planning and 3D documentation into a single model, which can be visualized in a modern web browser without plugins. Different construction phases are visualized in a unique and shared global model, which is updated along execution time according to a well-specified visual planning. Our application allows identifying bottlenecks or delays in processes with a status indicator, which is updated along time. Filtering processes allows select the most meaningful aspects for each stakeholder to improve management and satisfaction for final client. The use of Open Source software and standard protocols and technologies allows a wide spread and rapid adoption of the solution, which can be easily extended to support future use cases. (C) 2015 Elsevier B.V. All rights reserved.
机译:BIM(建筑信息模型)方法允许在涉众之间共享有关同一建筑的信息。同一栋建筑将受到不同AEC(建筑,工程和施工)流程的影响。最近在文献中提出了一些n维扩展。 BIM的第四个维度代表建筑阶段的计划。此维度可用于模拟固定时间点的建筑状态,例如快照。本文展示了Web3D可视化工具的开发,该可视化工具仅使用开源软件就遵循BIM方法将3D文档与建筑规划集成在一起。我们的主要贡献是将项目计划和3D文档合并为一个模型,可以在没有插件的现代Web浏览器中对其进行可视化。在唯一且共享的全局模型中可视化不同的施工阶段,并根据明确指定的视觉计划在执行时进行更新。我们的应用程序允许使用状态指示器来识别过程中的瓶颈或延迟,状态指示器会随时间更新。筛选过程允许为每个利益相关者选择最有意义的方面,以改善最终客户的管理和满意度。使用开放源代码软件以及标准协议和技术可以使解决方案得到广泛传播和快速采用,可以轻松扩展该解决方案以支持将来的用例。 (C)2015 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号