...
首页> 外文期刊>CompressorTech Two: Dedicated to Gas Compression Products and Applications >CONTRACTS FLOW TO ROLLS-ROYCE IN HUGE CASPIAN PROJECT - ACG Project has Resulted in Orders Over the Past Six Years for 28 RB211 Packages
【24h】

CONTRACTS FLOW TO ROLLS-ROYCE IN HUGE CASPIAN PROJECT - ACG Project has Resulted in Orders Over the Past Six Years for 28 RB211 Packages

机译:大型卡巴斯基项目中的合同流向罗尔斯·罗伊斯公司-ACG项目已在过去六年中订购了28个RB211封装

获取原文
获取原文并翻译 | 示例
           

摘要

The Azeri-Chirag-Gunashli (ACG) oilfields are adding a new and important chapter to the Caspian's history. Lying 62 mi. (100 km) east of Baku under 419 to 574 ft. (128 to 175 m) of water, the linked fields are being developed by a BP-led consortium including Chevron, State Oil Company of the Azerbaijan Republic (SOCAR), Inpex, StatoilHydro, ExxonMobil, Turkish Petroleum Overseas Company (TPAO), Devon, ITOCHU and Hess in phases under a 30-year production sharing agreement signed in 1994. By any measure ACG is impressive. The huge structure comprises a series of reservoir horizons located 6561 to 11,482 ft. (2000 to 3500 m) beneath the Caspian Sea. Oil from Chirag began flowing in 1997 with first oil from the Central and West parts of the Azeri reservoir produced in 2005 and from East Azeri in 2006. At its peak the field will be producing 1 million barrels of oil a day - roughly 20% of the world's new supply.
机译:阿塞拜疆-奇拉格-古纳什利(ACG)油田为里海历史增添了新的重要篇章。说谎62 mi。巴库以东(100公里)在419至574英尺(128至175 m)的水位下,由BP牵头的财团正在开发这些油田,这些财团包括雪佛龙,阿塞拜疆共和国国家石油公司(SOCAR),Inpex, StatoilHydro,埃克森美孚,土耳其海外石油公司(TPAO),德文郡,伊藤忠商事和赫斯根据1994年签署的为期30年的生产分成协议分阶段进行。无论如何,ACG都令人印象深刻。巨大的结构包括一系列位于里海下方6561至11482英尺(2000至3500 m)的储层层位。奇拉格(Chirag)的石油于1997年开始流动,第一批石油从2005年从阿塞拜疆油藏中部和西部开始生产,2006年从东阿塞拜尔(East Azeri)开采。在高峰期,该油田每天将生产100万桶石油,约占总产量的20%世界的新供应。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号