首页> 外文期刊>圧力技術 >Investigation on the new high pressure vessel code: ASME sec. VII div. 3,3rd paper: fabrication and pressure relieving devices
【24h】

Investigation on the new high pressure vessel code: ASME sec. VII div. 3,3rd paper: fabrication and pressure relieving devices

机译:研究新的高压容器代码:ASME sec。第七分部3,3rd paper:制造和泄压装置

获取原文
获取原文并翻译 | 示例
           

摘要

Japan Pressure Vessel Council, JPVRC was asked to review the draft of ASME Code Sec. III Div. 3, Alternative Rules for Construction of High Pressure Vessels, from ASME Code Main Committee. The working group of JPVRC submitted to the Committeecomments for the requirements of Div. 3 ASME on December 1996. The first edition of Div. 3 in which the comments were refered was published on May 1997.The remarkable requirements of Div. 3 compared with those of Div. 2 were summarized in the first paper on General Requirements and Material Requirements, and in the second paper on Design Requirements.This paper summarizes the requirements on Fabrication Requirements and Pressure Relieving Devices.
机译:日本压力容器委员会JPVRC被要求审查ASME规范第2节的草案。第三分部3,ASME规范主要委员会的《高压容器制造替代规则》。 JPVRC工作组向委员会提交了对Div的要求的意见。 3 ASME,1996年12月。 1997年5月发布了其中引用了评论的第3条。与Div.3相比在第一篇关于通用要求和材料要求的文档中,对第二篇进行了总结,在第二篇关于设计要求的论文中进行了总结。本文概述了对制造要求和泄压装置的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号