Construction work of the high temperature engineering test reactor(HTTR)

机译:高温工程试验堆(HTTR)的建设工作

获取原文
获取原文并翻译 | 示例
           

摘要

The construction of the HTTR commenced with excavation for the building foundation in March 1991. The installaion of all the equipment was accomplished in November 1996. Fuji Electric completed the construction of the main systems, such as thereactor internals and fuel handling and storage systems, according to the master schedule. During the work, Fuji Electric consistently had stringent control over quality work execution, safety and work progress, and made the most of its long experience in plant construction. A record of 320,000-hour construction work without a personal injury was attained.
机译:HTTR的施工始于1991年3月,用于建筑基础的开挖。所有设备的安装已于1996年11月完成。富士电机完成了主要系统的建造,例如电抗器内部零件以及燃料处理和存储系统。到主时间表。在工作期间,富士电机始终严格控制高质量的工作执行,安全性和工作进度,并充分利用了其长期的工厂建设经验。创纪录的320,000小时的建筑工程没有人身伤害。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号