首页> 外文期刊>Приборостроение. Серия Приборостроение >Cost optimization for the operation of launch complexes during the post-warranty period
【24h】

Cost optimization for the operation of launch complexes during the post-warranty period

机译:保修期后发射综合体运行的成本优化

获取原文
获取原文并翻译 | 示例
       

摘要

The research covers the specific features of interconnection between the recovery of equipment technical resource and financial expenditures. The author describes the situation when one should continue launch complex operation under the conditions not invisaged in the design, without a scientific support which would allow to optimize the financial resources for various recovery activities of space launch complex facilities. He also describes the technology of planning the optimal resource management for operation of launch complexes during the post-warranty and end of life cycle period in the current situation. The author gives a general system of recurrence and functional equations, which make it possible to solve the problem.
机译:该研究涵盖了设备技术资源的回收与财务支出之间的相互联系的特定特征。作者描述了在没有科学支持的情况下应继续在设计中未设想的条件下继续进行复杂操作的情况,科学支持无法优化用于空间发射复杂设施的各种恢复活动的财政资源。他还介绍了在当前情况下的保修期后和生命周期结束期间为发射综合体的运行规划最佳资源管理的技术。作者给出了递归和泛函方程的一般系统,这使得解决该问题成为可能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号