...
首页> 外文期刊>資源と素材: 资源·素材学会志 >Multi-period Production Planning for Underground Cut-and-Fill associated with Operational Uncertainties
【24h】

Multi-period Production Planning for Underground Cut-and-Fill associated with Operational Uncertainties

机译:与运营不确定性相关的地下挖方和填方的多期生产计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In order to deal with the uncertainties regarding ore grade estimations, production rates and metal prices during overall planning periods, a Chance-constrained programming combined with a dynamic programming was developed to incorporate these uncertainties. Four cases of the Chance-constrained programming formulation were proposed under different uncertainty assumptions of ore grades, production rates and metal prices. Simulations were conducted by taking the magnitude of the Chance-constraint and objective function violations into consideration. Simulation results with respect to the studied mine clarify that the increase of the confidence levels of Chance-constraints can lead to the decrease of NPV of the planning project, whereas the increase of the given probabilities of maximizing the allowable limit of the fluctuation of metal prices can lead to the increase of the NPV.
机译:为了处理总体计划期间有关矿石品位估计,生产率和金属价格的不确定性,开发了机会约束编程与动态编程相结合的方法来纳入这些不确定性。在矿石品位,生产率和金属价格的不同不确定性假设下,提出了机会约束编程方案的四种情况。通过考虑机会约束的大小和违反目标函数的情况进行模拟。针对所研究矿山的模拟结果表明,机会约束置信度的增加可能导致计划项目的净现值降低,而给定概率的最大化则最大化了金属价格波动的允许极限可以导致NPV的增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号