...
首页> 外文期刊>Commercial Carrier Journal >Only time will tell: As industry explores LNG, when will LNG be ready for the industry?
【24h】

Only time will tell: As industry explores LNG, when will LNG be ready for the industry?

机译:只有时间会证明:随着行业对LNG的探索,LNG何时为该行业做好准备?

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

I recently visited the Paccar Technical Center in Mount Vernon, Wash., where Kenworth hosted a weeklong event to showcase their alternative-fuel vehicles for customers and press. The model on hand most applicable to regional and line-haul operations was a T800 day cab tractor equipped with a Westport GX15 liquefied natural gas engine, which is based on the Cummins ISX15 and reconfigured with Westport's LNG fuel system technology. The sweet spot for the LNG tractors is heavy-load, high fuel-consumption applications. Judging from my time driving the LNG-equipped T800 around the test track, the 475-hp engine provided plenty of torque - listed at 1,750 lb-ft - especially on the low end.
机译:我最近访问了位于华盛顿州芒特弗农的Paccar技术中心,肯沃思在这里举办了为期一周的活动,向客户和媒体展示他们的替代燃料汽车。现有的最适用于区域和航线运输的模型是配备了Westport GX15液化天然气发动机的T800日间驾驶拖拉机,该发动机基于康明斯ISX15,并重新配置了Westport的LNG燃料系统技术。 LNG拖拉机的最佳选择是重载,高油耗应用。从我在测试轨道上驾驶配备LNG的T800的时间来看,这台475马力的发动机提供了足够的扭矩-额定值为1,750 lb-ft-特别是在低端。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号