首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >Project solution for land reclamation and spatial arrangement of the 'Srebro' open pit mine at the Fruska Gora National Park
【24h】

Project solution for land reclamation and spatial arrangement of the 'Srebro' open pit mine at the Fruska Gora National Park

机译:Fruska Gora国家公园“ Srebro”露天矿的土地开垦和空间布置的项目解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

The exploitation of stone (trachyte) at the 'Srebro' open pit mine, located on the northern slopes of the Fruska Gora National Park (Serbia) central area begun in 1964. Stone exploitation in this locality does not endanger the environment in an ecological sense, does not pose a threat to plants and animals, and apart from the terrain configuration changes, it did not leave behind permanent consequences to the environment. Projects for permanent cessation of mining operations and for land reclamation and spatial arrangement were completed in these circumstances. The paper gives a short review of the condition at the open pit mine; furthermore, the key problems and basic demands are presented, together with a concept of technical and biological land reclamation and the spatial arrangement of the mining complex.
机译:1964年开始在Fruska Gora国家公园(塞尔维亚)中部地区北坡上的'Srebro'露天矿开采石头(长圆石)。从生态意义上讲,在该地区开采石头不会危害环境不会对动植物构成威胁,除地形配置变化外,它不会对环境造成永久性影响。在这种情况下,永久停止采矿作业以及土地开垦和空间布置的项目已经完成。本文简要介绍了露天矿的状况;此外,还提出了关键问题和基本要求,以及技术和生物土地开垦的概念以及采矿区的空间布置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号