首页> 外文期刊>Coke and chemistry >HOT REPAIRS TO OVEN CHAMBER LINING IN A COKING BATTERY
【24h】

HOT REPAIRS TO OVEN CHAMBER LINING IN A COKING BATTERY

机译:焦化电池的烤箱室热修复

获取原文
获取原文并翻译 | 示例
           

摘要

Coking battery No. 5 with chamber volume 41.6 m3 and bottom gas input was introduced into use on 30 September 1979. By 1996 there were serious defects in the lining of some of the oven chambers, which were due to deficiencies in the design of the No. 5 coking battery, the long working time, the low quality of the charge associated with difficulties in providing coal, and also various other subjective and objective factors, which have greatly reduced the throughput of the battery and produced a high level of discharges into the atmosphere. Six coking chambers have been withdrawn from use, while the 16th chamber is underloaded to 20-50 percent of the volume; and 50 fuel channels are not working.
机译:1979年9月30日开始使用容积为41.6 m3且底部气体输入的5号炼焦电池。到1996年,一些烘箱的内壁出现严重缺陷,这是由于No.3炉的设计缺陷所致。 5焦化电池,工作时间长,装煤困难,装料质量低以及其他各种主观和客观因素,这些都大大降低了电池的生产能力,并向电池产生了高水平的放电。大气层。六个焦化室已停止使用,而第16个焦室的负荷不足到其容积的20%至50%;和50个燃油通道不起作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号