...
首页> 外文期刊>Journal of the Korean Physical Society >Output beam energy measurement of a 100-MeV KOMAC drift tube linac by using a stripline beam position monitor
【24h】

Output beam energy measurement of a 100-MeV KOMAC drift tube linac by using a stripline beam position monitor

机译:使用带状线光束位置监控器测量100 MeV KOMAC漂移管直线加速器的输出光束能量

获取原文
获取原文并翻译 | 示例
           

摘要

The 100-MeV proton linac at the KOMAC (Korea Multi-purpose Accelerator Complex) is composed of a 50-keV proton injector, a 3-MeV RFQ (radio-frequency quadrupole) and a 100-MeV DTL (drift tube linac). The proton beam is accelerated from 3 MeV to 100 MeV through 11 DTL tanks. The precise measurement of the proton-beam's energy at the output of each DTL tank is important for the longitudinal beam dynamics and can be performed by using a time-of-flight method with a BPM (beam position monitor), which is installed between each DTL tank. The details of the output beam energy measurement of the KOMAC DTL with stripline-type BPM and BPM signal processing, along with a comparison with the simulation results, will be presented in this paper.
机译:KOMAC(韩国多功能加速器厂)的100MeV质子直线加速器由50keV质子喷射器,3-MeV RFQ(射频四极杆)和100MeV DTL(漂移管直线加速器)组成。通过11个DTL储罐,质子束从3 MeV加速到100 MeV。精确测量每个DTL储罐输出处的质子束能量对于纵向束动力学很重要,可以通过使用飞行时间方法和BPM(束位置监控器)来执行,该方法安装在每个之间DTL坦克。本文将介绍使用带状线型BPM和BPM信号处理的KOMAC DTL输出光束能量测量的详细信息,并与仿真结果进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号