...
首页> 外文期刊>Journal of the Institution of Engineers (India). Metallurgical and Material Engineering Division >Evaluation of preventive maintenance schedule and overhauling schedule for a continuous process plant
【24h】

Evaluation of preventive maintenance schedule and overhauling schedule for a continuous process plant

机译:评估连续过程工厂的预防性维护计划和大修计划

获取原文
获取原文并翻译 | 示例
           

摘要

This article evaluates the preventive maintenance schedule and the overhauling schedule for process/production machinery of a jute factory operating round the clock. The preventive maintenance schedule or, else say, frequency of preventive maintenance for any particular group of machines depends on various factors including work content, availability of relevant spare components, availability of requisite maintenance manpower, time period needed for completion of the said job, availability of appropriate quantity and grade of fluid and grease lubricant and workshop facilities. The overhauling schedule or frequency of overhauling for any particular group of machines depends on the rate of wear of both static and dynamic components and, hence, average minimum life of the same, downtime, product quality, production and productivity.
机译:本文评估了全天候运行的黄麻工厂的过程/生产机械的预防性维护计划和大修计划。预防性维护时间表或任何特定机器组的预防性维护频率取决于各种因素,包括工作内容,相关备件的可用性,必要维护人员的可用性,完成所述工作所需的时间段,可用性适当数量和等级的液体和油脂润滑剂以及车间设施。任何特定机器组的大修时间表或大修频率取决于静态和动态组件的磨损率,因此取决于其平均最小寿命,停机时间,产品质量,生产和生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号