【24h】

Development of rotating beryllium disk stripper

机译:旋转铍盘汽提塔的研制

获取原文
获取原文并翻译 | 示例
           

摘要

High-intensity uranium (U) ion beams are successfully provided at the RIKEN RI Beam Factory. We have attempted to extend the lifetime of the charge stripper as the U-beam intensity has increased. An attempt to enlarge the irradiated area using a rotating large carbon disk (C-disk) failed in 2006-2007 because no commercially available C-disk with 0.085 mm thickness met our requirements. In 2012, we tested a beryllium (Be) disk (0.1-mm-thick, diameter = 120 mm) as an alternative to the C-disk. The Be disk proved to be an adequate substitute, and has been successfully used during beam-time operation.
机译:在RIKEN RI Beam Factory成功提供了高强度铀(U)离子束。我们已尝试随着U光束强度的增加来延长电荷剥离器的寿命。在2006-2007年间尝试使用旋转大碳盘(C-disk)扩大辐照区域的尝试失败了,因为没有任何商用的厚度为0.085 mm的C-disk能够满足我们的要求。 2012年,我们测试了铍(Be)磁盘(厚度为0.1毫米,直径= 120毫米),以替代C磁盘。事实证明,Be圆盘是一种合适的替代品,并已在光束时间操作中成功使用。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号