首页> 外文期刊>Journal of Protective Coatings & Linings >M&J Painting Wins Hart Bridge Painting Project
【24h】

M&J Painting Wins Hart Bridge Painting Project

机译:M&J绘画赢得Hart Bridge绘画项目

获取原文
获取原文并翻译 | 示例
           

摘要

The Florida Department of Transportation awarded a contract of 26,244,610 to M&J Painting Company(Campbell,OH)to perform structural steel repairs and coatings application on the Hart Bridge,a 3,844-foot-long by 65-foot-wide steel through truss bridge over the St.Johns River.All existing structural steel surfaces will be pressure-washed,abrasive blast-cleaned to a Near-White finish(SSPC-SP 10),and coated with an organic zinc-rich epoxy primer,an epoxy intermediate,and a polyurethane finish.
机译:佛罗里达州交通运输部与M&J油漆公司(俄亥俄州坎贝尔)签订了26,244,610的合同,以在Hart桥上进行结构钢的修复和涂料施工,该桥是3,844英尺长​​,65英尺宽的钢,通过桁架桥贯穿于圣约翰斯河(St.Johns River)。将对所有现有结构钢表面进行高压清洗,喷砂清理至近白表面处理(SSPC-SP 10),并涂上富含有机锌的环氧底漆,环氧中间体和聚氨酯面漆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号