首页> 外文期刊>Journal of Protective Coatings & Linings >Hames Contracting To Work on Huey P. Long Bridge
【24h】

Hames Contracting To Work on Huey P. Long Bridge

机译:海姆斯签约在休伊·P·朗桥上工作

获取原文
获取原文并翻译 | 示例
           

摘要

The City of New Orleans, on behalf of the New Orleans Public Belt Railroad Commission, awarded a contract of USD3,900,000 to Names Contracting, Inc. (Alpharetta, GA) for coatings work on the 4.35-mile-long Huey P. Long Bridge. The contract, which required SSPC-QP1 and OP 2 certifications, involves recoating existing structural steel surfaces on 1,150 feet of deck truss spans. The steel will be abrasive blast cleaned with steel grit to a Near-White finish (SSPC-SP 1.0) and recoated with alkyd-based calcium borosilicate primer and intermediate coats, followed by an alkyd varnish finish. The contract includes containment of the existing lead-based coatings.
机译:新奥尔良市政府代表新奥尔良公共交通局铁路委员会与Names Contracting,Inc.(佐治亚州阿尔法利塔)签订了3,900,000美元的合同,用于在4.35英里长的Huey P. Long桥进行涂装工程。该合同需要SSPC-QP1和OP 2认证,涉及在1,150英尺甲板桁架跨度上重新涂覆现有的结构钢表面。钢材将用钢砂进行喷砂清理,以达到近白面漆(SSPC-SP 1.0),然后再涂上醇酸基硼硅酸钙底漆和中间涂层,然后涂上醇酸清漆。合同包括对现有铅基涂层的控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号