...
首页> 外文期刊>Coal Trader >GE sends Duke turbine that will run Edwardsport
【24h】

GE sends Duke turbine that will run Edwardsport

机译:通用电气派出将运行爱德华兹波特的杜克涡轮机

获取原文
获取原文并翻译 | 示例

摘要

Duke Energy Indiana is set to fire up the turbines that will power its 630-MW Edwardsport facility in 2012, now that both engines are at the site, GE Energy said on Monday. The second of two turbines arrived April 30, the first in early April, GE said in a statement. Gulf Coast states imported about 8.2 million st of coal in 2009, including 3.2 million st to JEA's St. John's River Power Park along the east coast of Florida, according to the Energy Information Administration. Most of the coal imported to the region originates at Colombian mines.
机译:GE能源周一表示,由于这两个发动机都在现场,印第安纳州杜克能源公司将为2012年为其630兆瓦的爱德华兹波特设施提供动力的涡轮机点火。通用电气在一份声明中说,两台涡轮机中的第二台是4月30日到达的,第一台是4月初。根据美国能源情报署(Energy Information Administration)的数据,2009年,墨西哥湾沿岸各州进口了约820万吨煤炭,其中320万吨是向佛罗里达州东海岸的JEA的圣约翰河电力公园供应的。进口到该地区的煤炭大部分来自哥伦比亚的煤矿。

著录项

  • 来源
    《Coal Trader 》 |2010年第may4期| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号