...
首页> 外文期刊>Journal of Petroleum Technology >Unconventional-Asset-Development Work Flow in the Eagle Ford Shale
【24h】

Unconventional-Asset-Development Work Flow in the Eagle Ford Shale

机译:Eagle Ford页岩的非常规资产开发工作流程

获取原文
获取原文并翻译 | 示例

摘要

Development of the Eagle Ford shale typically consists of horizontal wells stimulated with multiple hydraulic-fracture stages. This paper presents a pragmatic integrated work flow used to optimize development and guide critical development decisions in the Black Hawk field. Geoscientists and reservoir and completion engineers worked collaboratively to identify optimal completion designs and well spacings for development focus areas. Multiple simplistic simulation models were history matched to existing production wells.
机译:Eagle Ford页岩的开发通常包括通过多个水力压裂阶段进行增产的水平井。本文提出了一个务实的集成工作流程,用于优化“黑鹰”领域的开发并指导重要的开发决策。地学家与储层和完井工程师共同努力,为开发重点领域确定最佳的完井设计和井距。历史上将多个简单的模拟模型与现有的生产井进行了匹配。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号