...
首页> 外文期刊>Journal of Petroleum Technology >Well Management: Use of Permanent Downhole Flowmeters for Pressure-Transient Analysis
【24h】

Well Management: Use of Permanent Downhole Flowmeters for Pressure-Transient Analysis

机译:井管理:使用永久性井下流量计进行压力瞬变分析

获取原文
获取原文并翻译 | 示例
           

摘要

Considering the large capital investments and returns for high-rate completions in overpressured unconsolidated-sandstone reservoirs,a testing method with defined objectives,designed to define acceptable risk levels for rates of individual completions,was necessary.Critical parameters,such as permeability and skin,are dynamic properties in these types of reservoirs and require frequent measurement.A program was implemented in the Boris field that relies on the use of permanent downhole pressure gauges and flowmeters.
机译:考虑到超压未固结砂岩油藏的大量资本投资和高完井率的回报,有必要采用一种确定目标的测试方法,旨在为各个完井率定义可接受的风险水平。渗透率和表皮等关键参数这些类型的油藏具有动态特性,需要经常测量。在Boris油田实施了一个程序,该程序依赖于永久性井下压力计和流量计的使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号