首页> 外文期刊>Coal Trader >End of EIS contract for stream rule questioned
【24h】

End of EIS contract for stream rule questioned

机译:有关流规则的EIS合同终止受到质疑

获取原文
获取原文并翻译 | 示例
           

摘要

The Office of Surface Mining’s Stream Protection Rule is still on track to be released this year, despite the contract ending early for the firm working on the draft environmental impact statement, a spokesman said Friday. Polu Kai Services was contracted to work on the draft EIS, which evaluates the alternatives under consideration as part of the rule. Portions of the draft document were leaked and showed the rule could potentially impact thousands of jobs, outraging coal-state lawmakers (PCT 2/1).
机译:一位发言人周五说,尽管有关该公司的环境影响声明草案的合同提早终止,但露天采矿办公室的“河流保护规则”仍有望在今年发布。与Polu Kai Services签订了合同,负责制定EIS草案,该草案评估了作为规则一部分的正在考虑的替代方案。该文件草案的某些部分被泄露,并表明该规则可能潜在地影响成千上万的工作,激怒了煤制立法者(PCT 2/1)。

著录项

  • 来源
    《Coal Trader》 |2011年第4期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号