Raw coal production in the country from underground and opencast mines during 2013-14 in CIL and its subsidiaries and in SCCL was 50.47 Mt as is indicated in Table 1.The following steps have been taken by CIL to enhance underground production (i) Gradual conversion of manual underground mines into semi-mechanized technology like load haul dump/side discharge loader with universal drilling machine (UDM). (ii) Mass production technology i.e. use of continuous miner and longwall technology, development in transport infrastructure, (iii) Deployment of 7 continuous miners with a capacity of about 2.835 Mty. Further, project report for 20 mines has been approved for deployment of 25 continuous miners with total capacity of 11.385 Mty. (iv) Orders have been issued for operating five mines with long-wall technology.
机译:如表1所示,2013-14年度,CIL及其子公司和SCCL在该国的地下和露天矿的原煤产量为50.47 Mt,如表1所示.CIL已采取以下步骤来提高地下产量(i)逐步转换将人工地下矿山转变为半机械化技术,例如带有通用钻孔机(UDM)的负荷牵引卸料/侧卸装载机。 (ii)大规模生产技术,即使用连续采矿机和长壁技术,发展运输基础设施;(iii)部署7台连续采矿机,产能约2.835百万吨。此外,已经批准了20个矿山的项目报告,以部署25个连续采矿机,总容量为11.385百万。 (iv)已下达了经营五个采用长壁技术的矿山的订单。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号