首页> 外文期刊>Journal of Mines, Metals & Fuels >New dimension in hard roof management
【24h】

New dimension in hard roof management

机译:硬顶管理的新维度

获取原文
获取原文并翻译 | 示例
           

摘要

Extraction of coal under hard roof is a difficult task; Strata control problems like spalling of coal, overriding of pillars, air blast in bord & pillar workings and collapses of faces in longwall are common phenomena in Indian Coalfields.In India, there is no effective technique for hard roof management. Induced caving by blasting is the only available method to alleviate the problem but it has inherent limitations to practice. There is tremendous need to develop an effective technique to combat the hard roof problems. Control of hard roof by water injection under high pressure is a well established method in some countries but in India still it is at experimental stage. CMRI is trying to standardize the method to adopt in different Indian geo mining conditions.This paper emphasized the necessity of the method and enumerates the limitations of other techniques so far available. It describes major parameters of the method elaborately and presents the principle and general methodology in longwall as well as in Bord & Pillar workings.
机译:在坚硬的屋顶下开采煤炭是一项艰巨的任务。在印度煤田中,常见的现象包括煤层剥落,煤层压倒,煤层和煤层工作中的鼓风以及长壁工作面塌陷等地层控制问题。在印度,没有有效的技术来进行硬顶管理。爆破诱导崩落是缓解该问题的唯一可用方法,但实践中存在固有局限性。迫切需要开发一种有效的技术来解决硬顶问题。在某些国家,通过高压注水控制硬顶是一种行之有效的方法,但在印度,仍处于试验阶段。 CMRI正在尝试使该方法在印度不同的地质开采条件下采用。本文强调了该方法的必要性,并列举了迄今为止其他可用技术的局限性。它详细描述了该方法的主要参数,并介绍了长壁以及Bord&Pillar工作中的原理和通用方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号