Coal quality controlled by Wirtgen surface miners at Gracanica-Gacko pit mine

机译:由维特根露天采矿公司控制的Gracanica-Gacko矿井的煤炭质量

获取原文
获取原文并翻译 | 示例
           

摘要

Gacko coal pit mine, located in Bosnia and Herzegovina, has complex mining system, the combination of continuous and discontinuous mining systems operating on two mining fields. Mine deploys two Wirtgen surface miners for coal extraction cutting maximum 0,5 m coal slice. Surface miners' performances enable coal quality control essential for the strategic consumer thermal power station in Gacko. This article shows elements of mining operations and selective mining, achieving required coal quality. Gracanica-Gacko coal pit mine is one of the most important energy resources in Bosnia and Herzegovina. After approved reserves of 476 million tonnes of coal, exploitation started in 1977, reaching annual capacity of 1,8 million tonnes of coal and 3,2 million cu.m. of overburden. Exploitation field is separated in two mining fields: Field A and Field B. Both fields have an average stripping ratio of 2:1 m~3/t. In the vicinity of coal mine, Gacko I thermal power station is installed, producing 2 x 300 MW.
机译:位于波斯尼亚和黑塞哥维那的Gacko煤矿矿井具有复杂的采矿系统,是在两个矿场上运行的连续和不连续采矿系统的组合。矿山部署了两台维特根露天采矿机进行采煤,最多可切割0.5 m的煤层。露天采矿机的性能使煤炭质量控制成为Gacko战略性消费者热力发电厂必不可少的。本文介绍了实现所需煤质的采矿作业和选择性采矿的要素。 Gracanica-Gacko煤矿是波斯尼亚和黑塞哥维那最重要的能源之一。在批准了4.76亿吨煤炭的批准储量后,1977年开始开采,达到了180万吨煤炭和320万立方米的年产能。的负担。开采场分为两个开采场:场A和场B。两个场的平均剥采比为2:1 m〜3 / t。在煤矿附近,安装了Gacko I热电站,发电量为2 x 300 MW。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号