...
首页> 外文期刊>Journal of Mines, Metals & Fuels >An approach to tackle the problems of floor heaving near toe of external dump in an opencast coal mine of India
【24h】

An approach to tackle the problems of floor heaving near toe of external dump in an opencast coal mine of India

机译:解决印度露天煤矿外部堆放场脚趾附近地面沉陷问题的方法

获取原文
获取原文并翻译 | 示例
           

摘要

India with a very high density of population is in a very disadvantageous position in acquiring large tracts of land for opencast coal mining with the concurrent problems of depletion of forest area, resettlement and rehabilitation of people affected by projects. Opencast coal mining involves handling of large volume of waste rock overburden (O.B), a portion of which is back-filled in the de-coaled area of the quarry. The balance O.B. has to be dumped outside the quarry in a convenient place considering the safety, environment and economical aspects. This waste material dumped outside the quarry is termed as external dump. This paper deals with a specific case study of a mine, (located in eastern part of India) which has experienced floor heaving near toe of 75metre high external dump standing above 20m soft soil strata fully saturated with water (Fig 1). The methodology to tackle the problem of floor heaving by undertaking detailed slope stability study and its recommendation is discussed in this paper.
机译:人口密度很高的印度在获取大片土地进行露天煤矿开采方面处于非常不利的地位,同时还存在森林面积枯竭,受项目影响的人们重新安置和复原的问题。露天煤矿开采涉及处理大量废石覆盖物(O.B),其中一部分回填到采石场的脱煤区。余额O.B.考虑到安全,环境和经济方面的原因,必须将其倾倒在采石场之外的便利位置。倾倒在采石场之外的这种废物称为外部倾倒。本文针对某矿山(位于印度东部)的一个具体案例进行研究,该矿山的脚底沉陷在75米高的外部堆放场附近,该矿场位于充满水的20m软土层之上(图1)。本文讨论了通过进行详细的边坡稳定性研究来解决地面沉陷问题的方法,并提出了建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号