首页> 外文期刊>Journal of Mines, Metals & Fuels >Experience with the operation of powered support longwall face in SECL with particular reference to Balrampur
【24h】

Experience with the operation of powered support longwall face in SECL with particular reference to Balrampur

机译:有在SECL中使用动力支撑长壁工作面的经验,尤其要参考Balrampur

获取原文
获取原文并翻译 | 示例
           

摘要

While some people believe that there are noprospects of longwall technology in India due to adverse geo-mining conditions, it is the opinion of the authors that if a suitablelocale can be identified and proper geo-technical investigationsdone to assess the capacity of the supports, there is no reason whythe PSLW face would not be a success. Even today we do not haveany expertise to assess the capacity of the supports correctly. Wealso cannot predict the cavability of roof in advance. Most of thecountries where longwall technology has been proved successfuldepend greatly on the numerical model for assessing the stratabehaviour in advance.
机译:尽管有人认为,由于不利的地质开采条件,印度没有长壁技术的前景,但作者认为,如果能够确定合适的地点并进行适当的岩土技术评估以评估支撑物的能力,没有理由说PSLW的面子不会成功。即使在今天,我们也没有专业知识来正确评估支撑的能力。我们也无法提前预测屋顶的空洞性。多数已证明长壁技术成功的国家很大程度上取决于预先评估地层性的数值模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号