首页> 外文期刊>Coal Outlook >Kentucky Pioneer's IGCC struggles for foothold
【24h】

Kentucky Pioneer's IGCC struggles for foothold

机译:肯塔基先锋的IGCC努力立足

获取原文
获取原文并翻译 | 示例
           

摘要

In a move that was no surprise considering recent history, East Kentucky Power Co-op on Oct. 5 sent a letter to Global Energy saying it is terminating a contract to buy electricity from the Kentucky Pioneer Energy project. Kentucky Pioneer is a 520-MW (net) project that would use advanced integrated gasification combined cycle (IGCC) technology to process a combination of coal and municipal waste. The project, at the time located elsewhere, got a Department of Energy clean-coal award in the mid-1990s. But trouble dogged its footsteps even after a relocation to Clark County, Ky., and a firm contract was reached with EKPC to buy its electricity
机译:考虑到最近的历史,这一举动不足为奇,东肯塔基电力合作社于10月5日致函Global Energy,称其正在终止从肯塔基先锋能源项目购买电力的合同。肯塔基先锋公司是一个520兆瓦(净)项目,该项目将使用先进的整体气化联合循环(IGCC)技术来处理煤炭和城市垃圾的组合。该项目当时位于其他地方,在1990年代中期获得了能源部清洁煤奖。但是,即使搬迁到肯塔基州克拉克县,麻烦也仍然dog绕着脚步,并且与EKPC签订了购买电力的牢固合同

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号