...
首页> 外文期刊>Coal Outlook >Texas developer seeks to seal water deal for 1,200-MW coal project
【24h】

Texas developer seeks to seal water deal for 1,200-MW coal project

机译:德克萨斯州开发商寻求达成1,200兆瓦煤炭项目的水上交易

获取原文
获取原文并翻译 | 示例

摘要

The 1,200-MW, coal-fired White Stallion project inMatagorda County, Texas, remains on track despite a setbackin securing a water-supply agreement with the Lower Colorado River Authority, the developer said this week.Randy Bird, vice president of Houston-based Sky Energy,said in an interview the developer has appealed to the TexasSupreme Court rulings by lower courts that would requirethe state Commission on Environmental Quality to take anew look at the project’s air permit.
机译:开发商本周表示,尽管遭受挫折以确保与下科罗拉多河管理局达成供水协议,但得克萨斯州马塔哥达县的1,200兆瓦燃煤白色种马项目仍在按计划进行。天空能源公司在一次采访中说,开发商已向德克萨斯州最高法院的下级法院提起上诉,要求州环境质量委员会重新审视该项目的空气许可证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号