首页> 外文期刊>Coal Outlook >Alliance close to a decision on longwall, others get DEP permits
【24h】

Alliance close to a decision on longwall, others get DEP permits

机译:联盟即将就长壁墙做出决定,其他人则获得了DEP许可

获取原文
获取原文并翻译 | 示例
           

摘要

Alliance Coal is close to receiving a decision from the West Virginia Department of Environmental Protection on a permit for its E long-wall mine, which will work an Upper Freeport-seam reserve in Grant and Tucker counties. Last year, the DEP rejected the first application for this mine, which is the eventual replacement for the Mettiki longwall mine in Maryland. That rejection came because Alliance could not guarantee that after the mine closed, acidic water would not leach into CON-SOL Energy's long-shut Potomac mine next door. CONSOL already has a responsibility to treat acidic water coming from that mine and any water from the E mine would only worsen the problem.
机译:Alliance Coal即将收到西弗吉尼亚州环境保护局关于其E长壁煤矿的许可的决定,该煤矿将在Grant和Tucker县的Freeport-seam上游矿区工作。去年,DEP拒绝了该矿的第一份申请,该申请最终替代了马里兰州的Mettiki长壁矿。之所以拒绝,是因为Alliance无法保证在关闭矿山后,酸性水不会渗入CON-SOL Energy长期关闭的波托马克矿山。 CONSOL已经有责任处理来自该矿山的酸性水,而来自E矿山的任何水只会使问题恶化。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号