...
首页> 外文期刊>Coal Outlook >Illinois Basin pulled down by a soft market, increased Foresight production
【24h】

Illinois Basin pulled down by a soft market, increased Foresight production

机译:伊利诺伊盆地受市场疲软拖累,前瞻性产量增加

获取原文
获取原文并翻译 | 示例
           

摘要

Platts assessed Illinois Basin prices lower for the week ending June 28, based on survey results that indicate soft domestic demand and downward price pressure from Chris Cline's Foresight Energy, the basin's low-cost producer. One basin producer said Foresight is heavily discounting coal from its Hillsboro mine, also known as Deer Creek, in Montgomery County, Illinois, in order to move it.
机译:普氏能源资讯根据调查结果显示,截至6月28日的一周伊利诺伊州盆地价格下跌,该结果表明国内需求疲软以及该盆地低成本生产商克里斯·克莱恩的前瞻能源公司的价格下行压力。一位流域生产商表示,Foresight正在为其伊利诺伊州蒙哥马利县的希尔斯伯勒矿山(也称为鹿溪)打折煤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号