首页> 外文期刊>Coal Americas >Exporters in Cesar Basin face shipment delays, fighting off force majeure
【24h】

Exporters in Cesar Basin face shipment delays, fighting off force majeure

机译:塞萨尔盆地出口商面临发货延迟,应对不可抗力

获取原文
获取原文并翻译 | 示例
           

摘要

Weather continues to be a problem for Colombian coal producers. "The heavy rains aren't as bad as they were last year, but the situation is still terrible down here," a source in Bogota told Coal Americas, Relentless rain has hammered one of Colombia's largest export coal producing regions - the Cesar Basin. Cesar is the home to Drummond's La Loma and Descanso mines (26 MMt/y) and (Glencore) Prodeco's Calenturitas and La Jagua mines (15.0 MMt/y). In addition, several important smaller exporters are located in the Cesar Basin, including Vale (4.5 MMt/y) and Goldman Sachs (2.4 MMt/y).
机译:天气仍然是哥伦比亚煤炭生产商面临的问题。波哥大一位消息人士告诉美国煤炭公司:“暴雨虽然没有去年那么严重,但是这里的局势仍然很糟糕。”无情的暴雨打击了哥伦比亚最大的煤炭出口地区之一塞萨尔盆地。塞萨尔(Cesar)是德拉蒙德(Drummond)的拉洛玛(La Loma)和德斯坎索(Descanso)矿(年产26 MMt /年)和普罗德科(Prodeco)的Calenturitas和拉加瓜矿(年产量15.0 MMt)的所在地。此外,塞萨尔盆地有几个重要的较小出口商,包括淡水河谷(4.5 MMt / y)和高盛(2.4 MMt / y)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号