首页> 外文期刊>Coal Americas >Colombian president unveils coal terminal project
【24h】

Colombian president unveils coal terminal project

机译:哥伦比亚总统宣布煤炭码头项目

获取原文
获取原文并翻译 | 示例
           

摘要

Colombian President Alvaro Uribe Velez unveiled plans to construct a 300 million US dollars coal terminal at Santa Marta. Construction on the project is expected to take four years. The coal terminal will enlist special measures to limit the spread of coal dust to heavily populated tourist areas in Santa Marta.- The stockyard will be connected to the ocean by a tunnel and vessels will use an access channel away from beaches where tourists gather. To reduce the spread of coal dust, stockpiles will be constructed near hills that will block the wind from carrying dust to populated areas.
机译:哥伦比亚总统阿尔瓦罗·乌里韦·贝莱斯公布了在圣玛尔塔建设一个耗资3亿美元的煤炭码头的计划。该项目的建设预计将耗时四年。煤炭码头将采取特殊措施,以限制煤尘向圣玛尔塔人口稠密的旅游区扩散。-牲畜饲养场将通过隧道连接到海洋,船只将使用远离游客聚集的海滩的通道。为了减少煤尘的扩散,将在丘陵附近建造堆垛,以阻止风将尘埃带到人口稠密的地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号