首页> 外文期刊>Coal Americas >Robert Stan: Successful mining operations built over years, not months
【24h】

Robert Stan: Successful mining operations built over years, not months

机译:罗伯特·斯坦(Robert Stan):成功的采矿运营历经数年而不是数月

获取原文
获取原文并翻译 | 示例
           

摘要

"Mining is a long-term initiative. Successfully mining operations are built over years not months. Grande Cache Coal has been in operation and producing coal for one year now. Our first export sale was about 11 mos ago in November 2004. In the period to Sept 30, 2005 we have shipped nearly 800,000 tonnes of coal. There have been problems along the way. It has taken longer and cost more than was initially anticipated to reach a stable production level. Some problems were unforeseen. Some problems were not totally unexpected. Foreign exchange rates, energy crisis, labor shortages, delays in delivery of equipment and weather problems have all acted against us. Along the way we were optimistic about our ability to deal with these circumstances and our ability to realize production volume increases rapidly. Clearly we were overly optimistic and our expectations have not been met.
机译:“采矿是一项长期计划。成功地进行采矿运营需要数年而不是数月的时间。GrandeCache Coal已投入运营并生产煤炭已有一年。我们的第一次出口销售是在2004年11月之前的11个月。到2005年9月30日,我们已经运送了近80万吨煤炭,这期间一直存在问题,花费的时间更长,成本也比最初预期的要达到稳定的生产水平,有些问题是无法预料的,​​有些问题并不是完全可以解决的。汇率,能源危机,劳动力短缺,设备交付延误和天气问题都对我们造成了不利影响,我们对这种情况的处理能力持乐观态度,而且实现产量的能力迅速提高。显然,我们过于乐观,没有达到我们的期望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号