首页> 外文期刊>Coal Americas >Chile's Central Termoelectrica Andina power plant to be commissioned in October
【24h】

Chile's Central Termoelectrica Andina power plant to be commissioned in October

机译:智利中央Termoelectrica Andina电厂将于10月投产

获取原文
获取原文并翻译 | 示例
           

摘要

In Chile, E-CL's 150-megawatt Central Termoelectrica Andina (CTA) coal-fired power plant will be commissioned in October.CTA will primarily supply power to mining and industrial companies in Chile's northern interconnected SING system. Total investment in the plant, which is equipped with a fluidized bed system and state-of-the-art technology, is US$496 million.
机译:在智利,E-CL的150兆瓦安迪纳中央热电厂(CTA)的燃煤电厂将于10月投产,CTA将主要为智利北部互连SING系统中的采矿和工业公司供电。该工厂配备流化床系统和最先进的技术,总投资为4.96亿美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号