Brazil's Votorantim and Colombian steel- maker Acesco may shelve plans to construct a steel plant in northern Colombia. The proposed plant, Siderurgica del Rio Grande de la Magdalena, would have the capacity to produce 1.4 million tonnes per year of hot rolled coil. Investment cost were estimated at US$1.3 million.
展开▼
机译:巴西的Votorantim和哥伦比亚的钢铁生产商Acesco可能搁置了在哥伦比亚北部建设钢厂的计划。拟建的工厂,Siderurgica del Rio Grande de Magdalena,将具有每年生产140万吨热轧卷的能力。投资成本估计为130万美元。
展开▼