...
首页> 外文期刊>Coal Americas >Vale is working to repair coal unloaders at Praia Mole, could take awhile
【24h】

Vale is working to repair coal unloaders at Praia Mole, could take awhile

机译:淡水河谷正在维修Praia Mole的卸煤机,可能需要一段时间

获取原文
获取原文并翻译 | 示例
           

摘要

Vale expects to have one coal unloader back in operation at Praia Mole Port by the beginning of February, a Brazilian steel official told Coal Americas. "Vale is working diligently to repair the two coal unloaders that were partially damaged by high winds," the source said. "That is the highest priority at this point. Everyone realizes that it will take time to replace the two unloaders that were totally destroyed by the storm."
机译:一位巴西钢铁官员告诉美国煤炭公司,Vale预计2月初将在Praia Mole港口恢复一个卸煤机的运行。消息人士说:“瓦尔正在努力修复这两个因大风而部分损坏的卸煤机。” “这是目前的头等大事。每个人都意识到,更换被风暴完全摧毁的两台卸货机将需要时间。”

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号