...
首页> 外文期刊>Journal of Hydrology >First-passage time criteria for the operation of reservoirs
【24h】

First-passage time criteria for the operation of reservoirs

机译:水库运行的首次通过时间标准

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A multi-objective optimisation for reservoir operation based on expected monetary value and expected first passage-time criterion is proposed. The computations are facilitated by the algorithms of matrix analytic methods. The formal structure, classifying states as levels and phases within levels, and associated algorithms of matrix analytic methods are introduced in the context of multi-reservoir systems. The algorithms underpin the feasibility of the computations for large systems and enable the calculation of the full distribution of first passage time. A new algorithm for computing results for a seasonal model, which reduces computing time by an order of magnitude for monthly time steps is presented. The methods are illustrated for a two reservoir system, with an option of pumping additional water from a transfer scheme, in the East of England. The Pareto front of Pareto optimal policies is shown. (C) 2014 Elsevier B.V. All rights reserved.
机译:提出了基于期望货币价值和期望首次通过时间准则的水库调度多目标优化方法。矩阵分析方法的算法促进了计算。在多储层系统的背景下,介绍了形式结构,将状态分类为级别和级别内的阶段以及相关的矩阵分析方法算法。这些算法为大型系统的计算奠定了基础,并能够计算出首次通过时间的全部分布。提出了一种用于计算季节性模型结果的新算法,该算法将每月时间步长的计算时间减少了一个数量级。说明了英格兰东部的两水库系统的方法,可以选择从转移计划中抽水。显示了帕累托最优策略的帕累托前沿。 (C)2014 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号