首页> 外文期刊>Coal Americas >MPX Energia will burn 2.8 million tonnes of coal per year at new power plants in Brazil
【24h】

MPX Energia will burn 2.8 million tonnes of coal per year at new power plants in Brazil

机译:MPX Energia每年将在巴西的新电厂燃烧280万吨煤炭

获取原文
获取原文并翻译 | 示例
           

摘要

Brazilian-based MPX Energia will burn 2.8 million tonnes/year of imported coal at three new power plants that it is constructing in Brazil.The 720-megawatt Pecem I power project in Brazil's Ceara state is scheduled to become operational in the second half of 2011. It will burn 1.4 million tonnes/year of coal. According to MPX, construction on Pecem I is 73 percent complete. The first 360-megawatt module energy generator recently arrived at port and assembly of some boilers and turbines are in advanced stages.
机译:总部位于巴西的MPX Energia将在巴西建设的三座新电厂中燃烧280万吨/年的进口煤炭。巴西塞阿拉州的720兆瓦Pecem I发电项目计划于2011年下半年投入运营每年将燃烧140万吨煤炭。根据MPX的说法,Pecem I的建设已经完成了73%。最近第一台360兆瓦的模块式能源发电机抵达港口,一些锅炉和涡轮机的组装处于后期阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号