...
首页> 外文期刊>Journal of geophysical research. Solid earth: JGR >Evidence of instantaneous dynamic triggering during the seismic sequence of year 2000 in south Iceland
【24h】

Evidence of instantaneous dynamic triggering during the seismic sequence of year 2000 in south Iceland

机译:冰岛南部2000年地震序列期间瞬时动态触发的证据

获取原文
获取原文并翻译 | 示例
           

摘要

We analyze the coseismic stress perturbation during the 17 June 2000 south Iceland seismic sequence; the main shock (M s 6.6) was followed by three large events within a few tens of seconds (8, 26, and 30 s) located within 80 km. The aim of this paper is to investigate short-term fault interaction and instantaneous triggering. This happens when a fault perturbed by a stress change fails before the end of the transient stress perturbation. We compute the shear, normal, and Coulomb stress changes as functions of time in a stratified elastic half-space by using discrete wave number and reflectivity methods. We calculate dynamic stresses caused by the main shock at the hypocenters of these three subsequent events. Our numerical results show that the onset of the last two events is slightly delayed with respect to the arrival time of the second positive peak of Coulomb stress variation, while the first event occurred after the first positive stress peak. We have also analyzed the response of a spring slider system representing a fault governed by a rate- and state-dependent friction law, perturbed by shear and normal stress variations caused by the main shock. The fault response to the computed stress perturbations is always clock advanced. We have found suitable constitutive parameters of the modeled fault that allow the instantaneous dynamic triggering of these three earthquakes. If the initial sliding velocity is comparable with the tectonic loading velocity, we obtained failure times close to the observed origin times for low values of the initial effective normal stress.
机译:我们分析了2000年6月17日冰岛南部地震序列的同震应力扰动。主震(M s 6.6)之后是在30公里以内的几十秒内(8、26和30 s)发生了三起大型事件。本文的目的是研究短期故障相互作用和瞬时触发。当受应力变化干扰的故障在瞬态应力扰动结束之前失败时,就会发生这种情况。我们通过使用离散波数和反射率方法,计算了分层弹性半空间中的剪应力,法向应力和库仑应力随时间的变化。我们计算了这三个后续事件的震源处由主震引起的动应力。我们的数值结果表明,相对于库仑应力变化的第二个正峰值的到达时间,最后两个事件的发生略有延迟,而第一个事件发生在第一个正应力峰值之后。我们还分析了弹簧滑块系统的响应,该滑块代表由受速率和状态决定的摩擦定律控制的故障,该故障受主冲击引起的剪切力和法向应力变化的干扰。对计算出的应力扰动的故障响应总是提前的。我们发现了模拟断层的合适本构参数,可以瞬时动态触发这三个地震。如果初始滑动速度与构造加载速度相当,则对于低有效初始法向应力值,我们获得的破坏时间接近观察到的原始时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号