...
首页> 外文期刊>Journal of geophysical research. Earth Surface: JGR >Overrun length of avalanches overtopping catching dams: Cross-comparison of small-scale laboratory experiments and observations from full-scale avalanches
【24h】

Overrun length of avalanches overtopping catching dams: Cross-comparison of small-scale laboratory experiments and observations from full-scale avalanches

机译:超过捕获大坝的雪崩的超长长度:小型实验室实验和全尺寸雪崩的观测结果的交叉比较

获取原文
获取原文并翻译 | 示例
           

摘要

Results from small-scale and full-scale experiments on avalanche–dam interactions are presented and compared. These experiments were analyzed with respect to the overrun length (i.e., the distance that the avalanche traveled beyond a catching dam). The differences and similarities in the results are discussed through a cross-comparison of the small-scale experiments and by comparing them with observations from Ryggfonn on avalanche–dam interactions. Further, we establish a simple relationship that appears to be valid for small-scale experiments with granular materials as well as for full-scale avalanche experiments. The relationship relates the overrun length to the speed of the approaching avalanche and the effective height of the catching dam.
机译:提出并比较了雪崩-大坝相互作用的小规模和大规模实验的结果。分析了这些实验的超长长度(即雪崩越过捕获大坝的距离)。通过对小规模实验的交叉比较,并将它们与Ryggfonn对雪崩-大坝相互作用的观察结果进行比较,讨论了结果的异同。此外,我们建立了一个简单的关系,该关系对于使用颗粒材料的小规模实验以及大规模雪崩实验似乎都是有效的。该关系将超支长度与即将发生的雪崩的速度和捕获大坝的有效高度相关。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号