首页> 外文期刊>Journal of environmental sciences >Laboratory-scale column study for remediation of TCE-contaminated aquifers using three-section controlled-release potassium permanganate barriers
【24h】

Laboratory-scale column study for remediation of TCE-contaminated aquifers using three-section controlled-release potassium permanganate barriers

机译:使用三节控释高锰酸钾屏障修复TCE污染的含水层的实验室规模的柱研究

获取原文
获取原文并翻译 | 示例
           

摘要

A laboratory-scale study with a sand column was designed to simulate trichloroethylene (TCE) pollution in the aquifer environment with three-section controlled-release potassium permanganate (CRP) barriers. The main objective of this study was to evaluate the feasibility of CRP barriers in remediation of TCE in aquifers in a long-term and controlled manner. CRP particles with a 1:3 molar ratio of KMnO_4 to stearic acid showed the best controlled-release properties in pure water, and the theoretical release time was 138.5 days. The results of TCE removal in the test column indicated that complete removal efficiency of TCE in a sand column by three-section CRP barriers could be reached within 15 days. The molar ratio of KMnO_4 to TCE in the three-section CRP barriers was 16:1, which was much lower than 82:1 as required when KMnO_4 solution is used directly to achieve complete destruction of TCE. This result revealed that the efficiency of CRP for remediation of TCE was highly improved after encapsulation.
机译:设计了带有沙柱的实验室规模的研究,以模拟含水层环境中三段式控释高锰酸钾(CRP)屏障的三氯乙烯(TCE)污染。这项研究的主要目的是评估CRP障碍以长期和可控的方式修复含水层中TCE的可行性。 KMnO_4与硬脂酸的摩尔比为1:3的CRP颗粒在纯水中具有最佳的控释性能,理论释放时间为138.5天。测试柱中三氯乙烯的去除结果表明,三段式CRP屏障可完全去除砂柱中三氯乙烯的效率,时间为15天。三段式CRP屏障中KMnO_4与TCE的摩尔比为16:1,远低于直接使用KMnO_4溶液完全破坏TCE所需的82:1。该结果表明,包封后,CRP对TCE的修复效率大大提高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号