首页> 外文期刊>Journal of Engineering Design >Requirements-based development of an improved engineering change management method
【24h】

Requirements-based development of an improved engineering change management method

机译:基于需求的改进工程变更管理方法开发

获取原文
获取原文并翻译 | 示例
           

摘要

Engineering changes (ECs) are essential in complex product development, and their management is a crucial discipline for engineering industries. Numerous methods have been developed to support EC management (ECM), of which the change prediction method (CPM) is one of the most established. This article contributes a requirements-based benchmarking approach to assess and improve existing methods. TheCPMis selected to be improved. First, based on a comprehensive literature survey and insights from industrial case studies, a set of 25 requirements for change management methods are developed. Second, these requirements are used as benchmarking criteria to assess the CPM in comparison to seven other promising methods. Third, the best-in-class solutions for each requirement are investigated to draw improvement suggestions for the CPM. Finally, an enhanced ECM method which implements these improvements is presented.
机译:工程变更(EC)在复杂的产品开发中至关重要,其管理对于工程行业而言是至关重要的学科。已经开发了许多方法来支持EC管理(ECM),其中变化预测方法(CPM)是最成熟的方法之一。本文为评估和改进现有方法提供了一种基于需求的基准测试方法。选择了需要改进的CPMi。首先,基于全面的文献调查和行业案例研究的见解,制定了一套25条变更管理方法要求。其次,与其他七种有希望的方法相比,这些要求被用作评估CPM的基准标准。第三,研究针对每种要求的最佳解决方案,以为CPM提出改进建议。最后,提出了实现这些改进的增强型ECM方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号