...
首页> 外文期刊>Journal of Engineering, Design and Technology >Major construction risk factors considered by general contractors in Qatar
【24h】

Major construction risk factors considered by general contractors in Qatar

机译:卡塔尔总承包商考虑的主要施工风险因素

获取原文
获取原文并翻译 | 示例

摘要

Purpose - The purpose of this paper is to identify, explore, rank the relative importance and determine the prevalent allocation response trends of the major construction risk factors considered by general contractors operating in the State of Qatar. Design/methodology/approach - A structured questionnaire survey comprising 37 potential risk factors was distributed to a statistically representative sample of contractors. The influence ranks of the factors explored were determined using the "Relative Importance Index (RII)" technique, whereas the prevalent trend of contractors' attitudes toward risk allocation of each factor investigated was quantified and expressed as a percentage, based on the number of respondents who selected a specific option, in relation to the total number of respondents. Findings - The results obtained indicate that risks related to the "client" group are perceived as most critical, followed by the "consultant", "contractor" and "exogenous" group-related factors, respectively. The outcomes further show that the "transfer" option is the contractors' prevalent response to "client" and "consultant"-related risks, while the "retention" decision is the principal pattern linked to "contractor" and "exogenous" group-related risk factors. Research limitations/implications- The dominant respondents' perception that the crucial construction risks are related to clients and consultants suggests that these two parties have an essential role in controlling the negative ramifications of the associated factors. Practical implications - The findings suggest that increasing designers' awareness of the significant effect of applying the constructability concept can considerably help reducing the risks concomitant of the construction operation. Policy makers may contribute, moreover, in alleviating the risk of incompetent technical staff and operatives' employment by controlling the migration of inexperienced and unskilled construction workforce into the State. Originality/value - Given the knowledge gap for the major construction risk factors considered by general contractors in Qatar, the results reported in this study can provide clients, industry practitioners and policy makers with guidance to effectively manage the significant risks determined, which can further assist in achieving a reasonable level of competitiveness and cost-effective operation.
机译:目的-本文的目的是确定,探索,排序相对重要性,并确定卡塔尔州运营的总承包商考虑的主要建筑风险因素的普遍分配响应趋势。设计/方法/方法-将包含37个潜在风险因素的结构化问卷调查分发给具有统计意义的承包商样本。使用“相对重要性指数(RII)”技术确定了所探究因素的影响力等级,而根据受访者的数量,对承包商对每种因素的风险分配态度的普遍趋势进行了量化并表示为百分比相对于受访者总数选择特定选项的人。发现-获得的结果表明,与“客户”组相关的风险被认为是最关键的,其次分别是与“顾问”,“承包商”和“外生”组相关的因素。结果进一步表明,“转移”选项是承包商对“客户”和“顾问”相关风险的普遍反应,而“保留”决策是与“承包商”和“外来”相关的主要模式风险因素。研究的局限性/含意-主要的受访者认为关键的施工风险与客户和顾问有关,这表明这两个方面在控制相关因素的负面影响方面起着至关重要的作用。实际意义-研究结果表明,提高设计师对应用可施工性概念的显着效果的认识可以极大地帮助降低施工过程中的风险。此外,决策者可以通过控制缺乏经验和技能的建筑工人向国家的迁徙,为减轻技术人员和操作人员缺乏能力的风险做出贡献。原创性/价值-考虑到卡塔尔总承包商考虑的主要建筑风险因素的知识差距,本研究报告的结果可以为客户,行业从业人员和政策制定者提供指导,以有效管理已确定的重大风险,从而可以进一步为您提供帮助以实现合理水平的竞争力和具有成本效益的运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号